Contracts Supervisor at Willerby, Paul Pollington, explained the challenge to Sterk Systems. It was a particularly difficult access problem. Unlike conventional vertical walls, this one is set back at an angle of 70 degrees. And the ground at the foot of the wall slopes down and away from it, too. Strict safety rules on site meant that the plants on the wall couldn't be maintained from a ladder, and following the resurfacing of the path beneath access by cherry picker was out of the question as well, even where the ground wasn't steeply sloping.

Willerby Landscapes are extremely pleased with their Sterk System. It would have been difficult, if not impossible, to have maintained the planted wall without it. The fact that the system can be dismantled and moved along the wall within a matter of minutes is also a great plus point for their busy staff.
The sloping wall at the London 2012 site can now be easily maintained using Sterk's Triangular Bridging System.
If you have an access challenge which you think Sterk Systems can help with contact us on 01494 582051.
No comments:
Post a Comment